tayyabadeel75 tayyabadeel75
  • 07-03-2021
  • Mathematics
contestada

If a building project takes 12 men to be completed in 54 days how many days will 9 men take to make it.

Respuesta :

Аноним Аноним
  • 07-03-2021

Answer:

y=72

Step-by-step explanation:

k= xy          [ inverse variation]

k= 12 x 54

 = 648

k= xy

648=9y

y = 648/ 9 = 72

I hope im right!!

Answer Link

Otras preguntas

The difference between osmosis and diffusion is that osmosis is the spreading of water from a high to low concentration while diffusion is the spreading of mole
What is a metropolitan area like
What's the best way to get rid of a cowlick?
Founders who supported natural rights also supported adding the Bill of Rights to the Constitution because
name the place value to which number was rounded 0.546 to .055
Selesaikanlah pertidaksamaan nilai mutlak berikut! [3-2x]<4
55% of what number is 22
Josiah ran 4/5 mile. How many tenths are equal to 4/5 mile.
What is negative 14 minus negative 18
What's the expanded notation for 876,543,210.25?